Supporting Complex NDT Delivery at Environ, Bristol

Supporting Complex NDT Delivery at Environ, Bristol

Client: Buttimer
Site: Environ, Bristol
Sector: Industrial / Energy Infrastructure
Services Delivered: Multi-disciplined NDT technicians providing RT, MT, UT and VT, full remote radiography capability

When Buttimer commenced works at the Environ site in Bristol, they required a reliable NDT partner capable of delivering a wide range of inspection services at scale. With the project located over 300 miles from MITS Group’s headquarters and scheduled over a long-term programme, consistency, capability and logistical reliability were critical from day one.

The Challenge

The Environ project is a complex, live construction environment requiring continuous non-destructive testing across multiple disciplines. Buttimer needed a partner that could supply qualified, multi-skilled NDT technicians, maintain full radiography capability on site, and operate safely and efficiently without reliance on local support infrastructure.

The distance from MITS Group’s HQ added an additional layer of complexity, requiring robust planning, dependable personnel, and the ability to sustain long-term delivery from Q2 2025 through to project completion, anticipated in June 2026.

Our Response

MITS Group mobilised a dedicated team of multi-disciplined NDT technicians to support the project on an ongoing basis. Our scope includes radiographic testing (RT), magnetic particle testing (MT), ultrasonic testing (UT) and visual inspection (VT, providing comprehensive coverage across all inspection requirements.

To meet the project’s demands, we established full site radiography capability, enabling inspections to be carried out efficiently and safely despite the site’s distance from our headquarters. Careful resource planning and consistent personnel deployment ensured continuity, reduced onboarding time, and maintained high standards of quality and safety throughout the project lifecycle.

Delivering Outcomes That Matter

Since commencing in Q2 2025, MITS Group has supported Buttimer by:

  • Providing reliable, multi-disciplined NDT coverage across RT, MT, UT and VT.
  • Maintaining full radiography capability on site, despite operating over 300 miles from HQ.
  • Supporting long-term project delivery through consistent staffing and robust planning.
  • Ensuring inspections are carried out efficiently, safely and in line with industry standards.

By combining technical expertise with strong logistical delivery, MITS Group continues to play a key role in the successful progression of the Environ project. Our ability to operate remotely, scale resources, and maintain inspection quality over an extended programme demonstrates our commitment to dependable, client-focused NDT solutions that support complex projects from start to finish.

Subscribe our newsletter

  • Unlimited access to all
  • Priority Support
Thank You, we'll be in touch soon.

Share article

MITS Group

Laing Close
Bolckow Industrial Estate
Middlesbrough
TS6 7EA

Who we are
Follow us

Website Design by Progressive Media & Design Ltd